DateAuthorEvent
19980815MarketonSent source to Swales for re-surfacing with BaSO4.
19980820MarketonIncreased lamp count from 12 to 16 and installed new lamps
19990228MarketonMoved sphere from Building 22 to Building 33.
19991013MarketonReplaced Kikusui power system with CF Standard Source Power System (SSPS).
19991105CooperReplaced lamps.
20000201CooperWork on monitor port bracket caused several approximately 1″ square paint chips to collect at bottom.
20000223MarketonHP DVM recalibrated.
20000225MarketonTechnicians grounded lamp power supplies’ DC negative to chassis; chassis to ground.
20000620MarketonPower Supply #3 blowing fuses. Replaced unit with Power Supply #3 from SSPS #2 pending repair of SSPS #1 Power Supply #3.
20000814MarketonChannel #3 (DAC #1) output low, resulting in low power supply output. Replaced DAC with SSPS #2 DAC pending repair of SSPS #1 DAC #1.
20000815MarketonModified monitor port to accept FRMS, and installed FRMS.
Vacuumed loose paint flakes from Hardy interior.
20000911CooperReplaced all lamps.
Lamps burned in for 24 hours.
20001017CooperInstalled repaired Power Supply #3.
Power Supply #4 blowing fuse. Replaced unit with Power Supply #3 from SSPS #2 pending repair of SSPS #1 Power Supply #4.
20010109MarketonRemoved FRMS.
20010222MarketonInstalled FRMS.
20010305MarketonReplaced LOB #1 with LOB #2 (includes thermometry on shunt resistors.
Replaced multimeter/multiplexer pair with acquisition system
Upgraded SSF to SSF version 2, including SSPS.
20010319CooperRemoved FRMS.
20010328CooperReplaced FRMS.
20011207-20020306MarketonSphere out of operation to:
– Repaint front hemisphere.
– Fab, install, paint new lamp mounts.
– FRMS 2-color detector upgrade. – FRMS 9-slot chopper blade upgrade.
– ECS installation.
– THMS installation.
– Lamp control box venting.
20020318MarketonRemoved Exhaust Vent Port baffling to improve exhaust draw for ECS.
20030113CooperReplaced all lamps.
Lamps burned in for 24 hours.
20030611MarketonDiscovered compressor on dehumidifier had cut off.
Inspected and turned on the compressor.
20040407CooperSwapped out defective DAC/488 for a spare.
20040611CooperReplaced all lamps. Vacuumed bottom of sphere.
Lamps burned in for 24 hours.
20050413CooperCalibrated resistors in switch box.
20050419CooperReplaced lamp number 1.
20060119CooperReplaced all 16 lamps, 24 hour burn-in.
20071009CooperReplaced all 16 lamps, 24 hour burn-in.
20080331CooperReplaced 3 lamps: #7, 15, 16.
20080818CooperReplaced all 16 lamps. 24 hour burn-in.